Foam Installation

April 22, 2012

I bought foam insulation boards to use as flotation foam in the boat.  Today I cut that up and put them into the different sections of the boat. They were already scored length wise in thirds so that made it easier to cut.

To get them down to size I used the my reciprocating saw with the fine tooth blade.  That cut right through them very quickly.





Here is the picture with the foam in place.  I want the foam to rise up about 1/2 inch so that there will be some compression when I lay the deck board over it.  That way it will solidify the hull even further.



I finished up the day with sizing and cutting the cleats that will create more surface to screw the deck plates down.



TO DO LIST:
-Cut and attach cleats at the top of the stringers and bulkheads
-Paint Cleats with Redguard.
-Purchase Plywood for the Deck (2 Sheets -- 1/2" MDO)
-Make patterns to use for cutting the deck wood
-Cut deck wood and screw to the stringers

Comments

Popular posts from this blog

Vacation

We went on vacation last week to Colorado and Utah via Kansas and Missouri. We saw 7 states in 9 days, took off on Thursday July 3 around 2 in the afternoon and headed west. Our first stop was in Topeka, Kansas where we spent the night. The next morning we got up and left after a good breakfast. Around 3 in the afternoon we got our first sight of the mountain and it was Pike's Peak over looking Colorado Springs, Co. That is where we spent the next 3 nights and the sights that we saw were Pike's Peak, Seven Falls, Garden of the Gods, and Manitou Springs. So we spent Friday, Saturday , and Sunday nights there. On Monday we took off for Cortez, Co. That is close to Mesa Verde. On the way there we were able to take in some good places like the Continental Divide and Treasure Falls. Once we got there we packed it up for the evening. The next day Tuesday brought us to Mesa Verde. There we spent the day looking at the ruins of the ancient Puebloan people who built the famous cli...

Deck Gel Coated...

May 25, 2012 I took this day off of work to work on the boat.  I wanted to get the deck ready to be Gel Coated which was ordered and received. First I gave the deck a good sanding.  It had been a while since we fiberglassed so I wanted to make sure that the surface was ready to receive the Gel Coat.  After I was finished with the sanding I moved the boat outside for a good cleaning.  Using an air compressor (Thanks Jack) I blew off the deck and then gave it a good acetone wash. That pretty much took up the entire day.  I had to wash the van because it got covered with dust.  Sorry no pictures of the progress today. May 26, 2012 The deck is now Gel Coated.  The four person team of Jack, Sally, Nina and myself worked for a long time again to get this job accomplished. We took the pigment for a gallon and added it directly to the container and then took turns shaking the can to thoroughly mix the color.  I believe that it looks great!...

Wiring and Seats...

May 27, 2012 The wiring is mostly complete (Thanks Jack!).  Now all of the lights are working and the bilge pump is wired to a switch on the dash.  Also the rats nest of wires has been cleaned up in the battery area! We are now getting down to the nitty gritty.  Just the final details of what needs to be done to get us out on a test drive. I spent Sunday and Monday working on the seats and seat boxes.  One of the boxes was in such bad shape that I decided to build a new one.  I also have decided to apply Red Guard to them before I staple the vinyl back on to them. TO DO List: -Finish Cubby hole cover and install -Finish Seats and install -Clean up the cut out above the Bilge, install Bilge pump and run hose -Get Tachometer wired -Take for a test drive!!!