Stringer & Bulkhead Templates


This weekend I worked on creating some of the stringer and bulkhead templates. I will use those to make the cuts in plywood. I have finished the center and both left and right stringer templates. One thing I got lucky with is that both the left and right stringers are the same size. So I will be able to use the same template when I cut both of those.

Next I have made the left and right front bulkhead templates and also the left middle and left rear.

The hull has a concave curve to it. So I measured out the area and then I drew the curve of the hull freehand.





It had a pretty big gap in it so I used a small strip and some duct tape to get the curve just right.



Then I took the template with the duct tape forms and created a new template.







And wa-la here is the finished product







This weekend I am going to finish the other bulkhead templates and I am going to build some racking to hold the stringers and bulkheads in place while I fiberglass them.

Comments

Popular posts from this blog

Stringer Math

Okay I have done some math on my stringers and bulkheads...let me know if this makes sense. There is 519" of area on both sides of the stringers 288" on both sides of the bulkheads So add those together and that give me 807" of total area or 67.25' or 22.42 yards. I figured that I will use 4" 1 1/2oz CSM tape for the first layer - Which uses 1.25gal of resin for a whole roll (110yards) but I will only figure for 25 yards...or .23 of a whole roll - So .23 x 160oz of resin (1.25gal) = 36.8oz of resin for the 1st layer Layer 2 I will use 6" 1 1/2oz CSM tape - Which uses 1.75gal of resin for a whole roll (110yards) - .23 x 224oz of resin (1.75gal) = 51.52oz of resin for the 2nd layer Layer 3 I will use 6" 1708 Biaxial and according to this website 1708 takes a little less resin to wet out than 1 1/2oz CSM so I will figure at CSM values: - .23 x 224oz of resin (1.75gal) = 51.52oz of resin for the 3rd layer Layer 4 will be a copy of the 3rd layer: - .23 x 2...

Deck Gel Coated...

May 25, 2012 I took this day off of work to work on the boat.  I wanted to get the deck ready to be Gel Coated which was ordered and received. First I gave the deck a good sanding.  It had been a while since we fiberglassed so I wanted to make sure that the surface was ready to receive the Gel Coat.  After I was finished with the sanding I moved the boat outside for a good cleaning.  Using an air compressor (Thanks Jack) I blew off the deck and then gave it a good acetone wash. That pretty much took up the entire day.  I had to wash the van because it got covered with dust.  Sorry no pictures of the progress today. May 26, 2012 The deck is now Gel Coated.  The four person team of Jack, Sally, Nina and myself worked for a long time again to get this job accomplished. We took the pigment for a gallon and added it directly to the container and then took turns shaking the can to thoroughly mix the color.  I believe that it looks great!...

Grinding Complete

February 19, 2012 Grinding is now complete. I guess that I am one of the lucky ones who doesn't get itchy from fiberglass dust. No pictures this weekend because of too much dust and I don't want to subject my camera to that. Next I have purchased some 3/4" foam board to do my templates of the stringers and bulkheads. I believe that I will be able to get by, if I have figured correctly, with 1 sheet of 3/4" Aruaco Plywood. Also on another note my local lumber yard has MDO plywood in stock!! Both in 1/2" and 3/4" thicknesses. So I know where I am going to get my deck plywood. Hopefully next weekend I will get the boat out to give it a good washing down. I want to wash off the tarp and hang it up to dry and wash/vacuum the whole boat to make it free of dust.